LV-12V-100Ah Installation Guide
Safety Warning
⚠️ Before installation:
- Professional installation required
- Wear insulating protective equipment
- Ensure power is disconnected
- Read product manual
Installation Environment
Indoor Installation
- Well ventilated
- Dry, no corrosive gases
- Temperature: -20°C ~ 45°C
- Avoid direct sunlight
Mounting Requirements
- Load capacity ≥ 15kg
- Securely fixed
- Maintenance space (front/rear ≥ 50cm)
Installation Steps
1. Unpacking and Inspection
- Check packaging
- Confirm model
- Verify accessories
2. Mount Battery
- Use expansion bolts
- Keep vertical
- Verify stability
3. Electrical Connection
Battery + → Breaker → Load
Battery - → Load
4. Communication Connection
- RS485: A-A, B-B
- CAN: CAN_H-CAN_H, CAN_L-CAN_L
Inverter Compatibility
| Brand | Model | Compatible |
|---|---|---|
| Victron | EasySolar | ✅ |
| Growatt | SPH | ✅ |
| SMA | Sunny Boy Storage | ✅ |
| Solax | X1 | ✅ |
FAQ
Q: How to calculate capacity in parallel?
A: Total capacity = Single unit × Number of units (max 400Ah)
Q: What breaker size is needed?
A: 100A breaker recommended